Skip to content
  • CSUMB Home
  • IT

Summer 2019 computer lab maintenance and imaging schedule

The following is the tentative schedule for Windows (we will add the Mac locations as soon as we can) computer lab/classroom maintenance and computer re-imaging:

Week of July 15

  • Library (508)

Week of July 22

  • Student Center (12)
  • Heron Hall (18)
  • Watershed (42)
  • Coast Hall (45)
  • Harbor Hall (46)
  • Student Services (47)
  • Chapman Science (53) Classroom/labs in this location will take 2-weeks.

Week of July 29

  • Reading Center (59)
  • Valley Hall (82)
  • Ocean Hall (86)
  • Oaks Hall (490)
  • Oaks Hall Annex (491)
  • Gambord (506)
  • Field House (902)
  • Science Lab Annex (50)
  • Chapman Science (53) Classroom/labs in this location will take 2-weeks.

Week of August 5

  • Building 504
  • Building 506

Locations that are still under review

  • Academic 3 (504)
  • Visual & Public Art (71)
  • Cinematic Arts & Tech (27)
  • Music Hall (30)
  • All other Mac computers/computer labs not listed above

The classrooms will not be available during maintenance, we will post signs on the doors while we are working and we will do everything we can to ensure the process is as least-disruptive as possible.

We use the information listed on 25Live to determine when a space is available. If the space is not listed or managed on 25Live, we will confirm availability with the department contact.

This schedule is subject to change and we will update it if/when things do change.

Information Technology

Phone
(831) 582-4357